TECHNOVACUUM

NEW TECHNOLOGY RESEARCH INNOVATION

 
Vacuum creating systems

1) based on vacuum hydrocirculating units

2) based on steam ejectors

Jet compression units
for flare and low-pressure gases recovery

1) based on two-phase jet devices

2) based on steam ejectors

 
Jet absorption gas cleaning units
for hydrocarbons removal from breathing gases and oil and petroleum products gases recovery

 
Jet devices
ejectors and injectors for various purposes







Technovacuum Ltd.
+7 (495) 956-76-21
+7 (499) 261-99-98
+7 (499) 267-82-03
Russia, 105082, Moscow
B.Pochtovaya str., 26 "B", build.2, 5-th floor, office 1, room 11A
 

List of installed vacuum creating systems
based on VHC unit

No. Place of introduction Type of internals in vacuum column Date of introduction Process parameters of vacuum column *
Operation mode Supply of stripping steam to the column Feed into column
1. Moscow Refinery
Column VK-1of AVDU AVT-3.
Grooved trays September
1993

Fuel Not supplied 220 t/h
2. Komsomolsk Refinery ÀÎÎÒ.
Column Ê-3 of AVDU
AVT-3.

Structured
packing
«Peton»
June
1995
Fuel Not supplied 180 t/h
3. Mazhekyay Refinery.
Column Ê-601 of ÊÒ-1/1 plant. **
Structured
packing
«NORTON»
November
1995
Fuel Not supplied 500 t/h
4. Ufaneftekhim OJSC
Column Ê-5 of AVDU AVT-4.
Structured
packing
«GLITCH»
September
1996
Fuel Not supplied 180 t/h
5. Mozyr Refinery JCS
Column Ê-1 of bitumen unit.
Structured
packing «GLITCH»
October
1996
Fuel Not supplied 110 t/h
6. Ufaneftekhim OJSC
Column Ê-5 of AVDU AVT-3.
Structured
packing
«GLITCH»
September
1997
Fuel Not supplied 240 t/h
7. Novokuibyshev Refinery JSC
Column Ê-5 of AVDU AVT-7.
Structured
packing
«SULZER»
November
1997
Fuel Supplied 80 t/h
8. Novokuibyshev Refinery JSC
Column Ê-5 of AVDU AVT-8.
Structured
packing
«SULZER»
February
1998
Lube Supplied 110 t/h
9. Ufaneftekhim OJSC
Column Ê-5 of AVDU AVT-1.
Structured
packing
«GLITCH»
May
1998
Lube Supplied 120 t/h
10. Novokuibyshev Refinery JSC
Column Ê-5 of AVDU AVT-9.
Structured
packing
«SULZER»
July
1998
Lube Supplied 110 t/h
11. UKRTATNAFTA OJSC» **
Vacuum column of GK-3/1 No.2 plant
Trays VNII-
NEFTEMASH
August
1998
Fuel Not supplied 200 t/h
12. Angarsk Refinery “ANCC” OJSC
Column Ê-5 of AVDU AVT-3.
Crosscurrent
packing
May
1999
Lube Supplied 200 t/h
13. Angarsk Refinery “ANCC” OJSC
Column Ê-6 of AVDU AVT-3.
Trays VNII-
NEFTEMASH
May
1999
Lube Supplied 100 t/h
14. Moscow Refinery OJSC
Column Ê-10 of AVDU AVT-6
Valve trays &
Structured
packing
October
1999
Fuel Supplied 400 t/h
15. Azerneftyanadzhag PC **
Column Ê-10 of AVDU AVT-6
Structured
packing
«GLITCH»
October
1999
Fuel Not supplied 400 t/h
16. Saratov Refinery OJSC
Column Ê-10 of AVDU AVT-6
Structured
packing «SULZER»
November
1999
Fuel Supplied 280 t/h
17. Angarsk Refinery “ANCC” OJSC
Column Ê-10 of AVDU AVT-6
Structured
packing
«Vacu –Pack»
June
2000
Lube Not supplied 375 t/h
18. Angarsk Refinery “ANCC” OJSC
Column Ê-11 of AVDU AVT-6
Structured
packing
«Vacu – Pack» trays
June
2000
Lube Supplied 125 t/h
19. Turkmenbashy Refinery
Column Ê-1 of VDU VT-1
Structured
Packing
«Peton»
October
2000
Fuel Supplied 220 t/h
20. Salavatnefteorgsynthesis OJSC, Salavat
Columns Ê-301, 313 for distillation of benzene-toluene-xylene cut
Trays November
2000
_ _ 15 t/h
21. Y.M. Sverdlov refinery FGUP»,
Dzerzhinsk,
Column 242 for distillation of alkylbenzene
Rundom
packing
December
2000
Not supplied 154 kg /h
22. Petrotel-Lukoil JSC,
Ploeshti, Romania,
Column 01-S5 of AVDU AVT -3,5.
Structured
«SULZER»
February 2001 Fuel “Dry” mode is possible 203 t/h
23. Shekino-Azot OJSC,
Columns Ê -1À, 3(5), 4, 4À, 12 for cyclohexanol-cyclohexanone separation.
Structured
packing /trays
March
2001
Not supplied
24. Syzran Refinery OJSC
Column Ê-10 AVDU AVT -6
Structured
packing
June
2001
Fuel Supplied 375 t/h
25. Ryazan Refinery OJSC
Column Ê-5 of AVDU AVT-4
Structured
packing «GLITCH»
June
2002
Lube Supplied 271 t/h
26. Pavlodar Petrochemical Plant ZAO
Column Ê-601/1 of ÊÒ-1 plant
Structured packing
«GLITCH»
September
2002
Fuel Not supplied 340 t/h
27. Khabarovsk Refinery OJSC
Column Ê-11 of AVDU AVT
Structured
packing
«Peton»
November
2002
Fuel Supplied 150 t/h
28. UKRTATNAFTA JSC
Column Ê-5 of AVDU AVT
Structured
packing
«GLITCH»
October
2003
Lube Supplied 230 t/h
29. UKRTATNAFTA JSC
Column Ê-6 of AVDU AVT
Structured
packing
«GLITCH»
October
2003
Lube Supplied 100 t/h
30. LUKOIL LTD.-Volgogradneftepererabotka
Columns Ê-5, Ê-6 of AVDU AVT-5
Trays June
2004
Lube “Dry” mode is possible 200 t/h
31. Ufimsky NPZ (Ufa Refinery) OJSC
Column Ê-10 of AVDU AVT-6
Structured packing «SULZER» September
2004
Fuel Supplied 500 t/h
32. Ufimsky NPZ (Ufa Refinery) OJSC
Column Ê-200 of visbreaking unit
Structured packing
«KEDR-89, Vacu-Pack»
September
2004
Fuel Not supplied 200 t/h
33. NPK-Galichina OJSC
Column Ê-8 of AVDU AVT-2
Preformed packing
«KEDR-89, Vacu-Pack»
October
2004
Lube Supplied 70 t/h
34. NPK-Galichina OJSC
Column Ê-4 of AVDU AVT-1
Preformed packing
«KEDR-89, Vacu-Pack»
April
2005
Lube Supplied 70 t/h
35. «KNPZ-KEN» ZAO
Column Ê-3 of AVDU AVT
Trays May
2006
Fuel Supplied 120 t/h
36. Ufaneftekhim OJSC
Column Ê-5 of AVDU AVT-3 (revamp)
Structured packing
«GLITCH»
December
2006
Fuel Supplied 240 t/h
37. Angarsk Refinery "ANCC"OJSC
Column Ê-13 of AVDU GK-3
Structured packing
«SULZER»
November
2007
Lube Not supplied 210 t/h
38. Ufaneftekhim OJSC
Column Ê-5 of AVDU AVT-4 (revamp)
Structured packing
«GLITCH»
April
2008
Fuel Supplied 240 t/h
39. Petrotel-Lukoil JSC,
Ploeshti, Romania,
Column 01-S5 of AVDU AVT -3,5 (revamp)
Structured packing
«SULZER»
February
2009
Fuel “Dry” mode is possible 170 t/h
40. «IOCL», Essar Oil Refinery, Vadinar, India
Column 40-C-003 of DHDS unit (gasoil dryer)
Trays October
2009
- Not supplied 405 t/h
41. Novoshahtinsky Refinery
Column K-5 of AVT-2,5 (I)
Structured packing
«GLITCH»
November
2009
Fuel Not supplied 150 t/h
42. LUKOIL Neftokhim Burgas AD, Bulgaria
Column Ê-101 of VDM-2 unit
Structured packing
«SULZER»
Marh
2010
Fuel Supplied 320 t/h
43. JSC «TAIF-NK»
Column Ê-10 of AVT-7 (revamp)
Structured packing
«SULZER»
October
2010
Fuel Supplied 420 t/h
44. «Atyrau Refinery» Ltd.
Atyrau, Kazakhstan
Column Ê-5 of AVT-3
Structured packing
«SULZER»
May
2011
Fuel Supplied 220 t/h
45. «TANEKO» Public Corporation
Column C0501 of ELOU-AVT-7
Structured packing
«SULZER»
March
2012
Fuel Supplied 598 t/h
46. «Novokuibyshevskiy Oil and Additive Plant»
Column Ê-4 of 39/8 unit for dewaxed oil drying
Trays
May
2012
- Supplied 30 t/h
47. «Novokuibyshevskiy Oil and Additive Plant»
Column Ê-4 of 39/4 unit for dewaxed oil drying
Trays
October
2012
- Supplied 30 t/h
48. «Novokuibyshevskiy Oil and Additive Plant»
Column Ê-4 of 39/5 unit for dewaxed oil drying
Trays
October
2012
- Supplied 30 t/h
49. «LUKOIL-Ukhtaneftepererabotka» Public Corp.
Column Ê-203 of AVT unit
Structured packing
«GLITCH»
January
2013
Fuel Supplied 275 t/h
50. «Novokuibyshevskiy Oil and Additive Plant»
Column Ê-1 of VT-1 unit
Preformed packing
«KEDR-89, Vacu-Pack»
July
2013
Lube Supplied 110 t/h
51. JSC «ORLEN Lietuva»
Lietuva, Mazeikiai
Column Ê-1 of visbreaking unit
Structured packing
«GLITCH»
February 2014 Fuel Supplied 250 t/h
52. Oil Refinery named after Heydar Aliyev
Azerbaijan, Baku
Column Ê-10 of AVT-6 unit (revamp)
Structured packing
«GLITCH»
May
2014
Fuel Not supplied 511 t/h
53. Hyundai Engineering Co,Ltd.
Turkmenbashi Oil Processing Complex
Column 100-Ñ-001 of Unit 100
Structured packing
«SULZER»
August
2015
Fuel Supplied 250 t/h
54. Novoshahtinsky Refinery
Column Ê-5 of AVT-2.5(II)unit
Structured packing
«GLITCH»
September
2015
Fuel Not supplied 160 t/h
55. Afipskiy Refinery
C-101 column of combined unit for mazut distillation and tar visbreaking
Structured packing
«GLITCH»
June
2017
Fuel Supplied 350 t/h
56. Dagnotekh Ltd.
K-6 Column of ELOU-AVT-1 plant
Trays
June
2017
Fuel Not supplied 65 t/h
57. JSC «NefteKhimServis»
Jajskiy Refinery, vac. column Ê-5 ELOU-ÀVÒ plant
Structured packing
«PIRO»
November
2017
Fuel Not supplied 160 t/h
58. Slavyansk-ECO Ltd.
K-4 Column of AT-5 plant
Structured packing
«PIRO»
April
2018
Fuel Supplied 187 t/h
59. Saratov Refinery OJSC
Column Ê-10 of AVDU AVT-6 (modernization)
Structured
packing «SULZER»
April
2019
Fuel Supplied 280 t/h
60. «IOCL», Essar Oil Refinery, Vadinar, India
Column 40-C-003 of DHDS unit (gasoil dryer) (modernization)
Trays July
2021
- - 405 t/h
61. Pavlodar Petrochemical Plant ZAO
Column Ê-601/1 of ÊÒ-1 plant (modernization)
Structured packing
«GLITCH»
October
2021
Fuel Not supplied 340 t/h
62. Novoshahtinsky Refinery
Column K-5 of AVT-2,5 (I) (modernization)
Structured packing
«GLITCH»
December
2021
Fuel Not supplied 180 t/h
63. Slavyansk-ECO Ltd.
K-4 Column of AT-5 plant (modernization)
Structured packing
«PIRO»
April
2022
Fuel Supplied 300 t/h

* - Vacuum depth at the column top is within the range of 15 - 55 mmHg depending on process conditions.
** - Introduction was conducted in framework of the license ¹ 4035/96 registered in ROSPATENT on 25.04.96.

 

Back



 




Technovacuum © 2019